OWNER'S OPERATING AND INSTALLATION MANUALfor domestic and standard export ovens©2014 Middleby Marshall Inc.is a registered trademark of Middleby
IV. ASSEMBLYA. Top Panel and Base Pad Assembly1. Install the four leg extensions onto the base pad usingthe 3/8″-16 × 1″ screws, 3/8″
NOTE: DO NOT install top panel onto double or triple ovens until AFTER stacking the oven cavities. See Part B, Stacking.B. StackingFor single ovens,
D. Conveyor Installation1. Unfold the conveyor as shown in Figure 2-12. Then,begin to slide the conveyor into the end of the oven. Theconveyor can on
18Vents on front panel of ovenFan grills (2) on rear of oven and control compartmentVent (1) on rear of machinery compartmentSECTION 4 - MAINTENANCEWA
21
SECTION 5 - WIRING DIAGRAMMiddleby-Marshall Model Number PS636G208-240 Volt 50/60Hz, 1 Phase23
NOTES24
Middleby Cooking Systems Group • 1400 Toastmaster Drive • Elgin, IL 60120 • USA • (847)741-3300 • FAX (847)741-4406 www.middleby-marshall.comMiddleby
2I. OVEN SPECIFICATIONSTable 1-1 Dimensions Single Oven Double Oven Triple Oven Overall Height 44″ (1118mm) 62-3/8” (1635mm) 69-3/4″ (1171mm)Ov
SECTION 2 – INSTALLATIONWARNING – After any conversions, readjustments, or service work on the oven:• Perform a gas leak test. • Test for proper co
PS636 24” OVEN INSTALLATIONREQUIRED KITS AND EQUIPMENTType Of InstallationPS636 Gas Oven Installation KitPS636 Single OvenOption Base w/15” Legs,Caste
III. VENTILATION SYSTEMB. RecommendationsNOTE THAT THE HOOD DIMENSIONS SHOWN IN FIGURE 2-5 ARE RECOMMENDATIONS ONLY. LOCAL, NATIONAL AND INTERNATIO
Commenti su questo manuale